CASE STUDIES

MAJOR PROJECTS

Future Recycling regularly completes complex major projects. We have the ability to recycle large volumes of materials as well as large cumbersome and obscure items.

CASE STUDY 1 - SITE CLEANS

Future Recycling was engaged to dispose of 680 tonnes of machinery, plant vehicles, waste and scrap metal.

  • The project took us two weeks to complete with works at 3 sites across Victoria
  • The project involved the use of excavators, semi-trucks and demolition professionals
  • We were able to complete the project safely, efficiently and at a cost benefit to our client
future-recycling-case-study-680-tonnes-150px

Machinery, plant vehicles, 3 x VIC sites
waste & scrap metal

future-recycling-case-study-victoria-150px

3 x Victorian sites

Excavators, semi-trucks
& demolition professionals

CASE STUDY 2 - UTILITIES

Future Recycling managed the dismantling of electrical transformers.

  • These transformers can weigh anywhere up to 100 tonnes
  • In order to complete the project safely and efficiently we employed the expertise of a utilities project manager
  • As we consistently operate in an open and honest manner we have become a trusted partner and an expert in the field of recycling transformers
future-recycling-case-study-transformer-150px

Dismantling
transformers

future-recycling-case-study-100-tonnes-150px

Weight of each
transformer

future-recycling-case-study-utilities-project-manager-hard-hat-150px

Experienced Utilities
Project Manager

CASE STUDY 3 – SITE CLEAN

Future Recycling was recently engaged by a long-term customer to remove up to 60 tonne of scrap metal and obsolete machinery from their site.

  • At the end of the project we removed 432 tonnes from site
  • The project took 12 days to complete, and we employed the use of semi tippers, Frannas , Sennebogen and crane semis
  • During the course of works we dismantled and removed an old insulation oven
  • We were able to process this at our Dandenong facility and divert 80 tonnes of machinery from landfill

Moved with tippers,
Frannas, Sennebogen
& crane semis

12 days to complete

Diverted from
landfill